Cover of: Surface impoundments | Robert P. Hartley Read Online
Share

Surface impoundments design, construction, and operation by Robert P. Hartley

  • 778 Want to read
  • ·
  • 71 Currently reading

Published by Noyes Data Corp. in Park Ridge, N.J., U.S.A .
Written in English

Subjects:

  • Surface impoundments.

Book details:

Edition Notes

Includes bibliographical references (p. 161-183).

Statementby Robert P. Hartley.
SeriesPollution technology review,, no. 209
Classifications
LC ClassificationsTD745 .H29 1992
The Physical Object
Paginationx, 183 p. :
Number of Pages183
ID Numbers
Open LibraryOL1561668M
ISBN 10081551302X
LC Control Number91043029

Download Surface impoundments

PDF EPUB FB2 MOBI RTF

A surface impoundment is a natural topographic depression, man–made excavation, or diked area formed primarily of earthen materials (although it may be lined with man–made materials), which is designed to hold an accumulation of liquid wastes or wastes containing free liquids. Examples of surface impoundments are holding, storage, settling.   Purchase Surface Impoundments - 1st Edition. Print Book & E-Book. ISBN , Book Edition: 1.   This technical resource document describes current information on the design, construction and operation of surface impoundments used for treatment, storage, or disposal of hazardous and non-hazardous wastes. Pertinent regulations under RCRA are summarized. Surface impoundment Brand: Robert P. Hartley. SURFACE IMPOUNDMENT ASSESSMENT NATIONAL REPORT OFFICE OF WATER OFFICE OF DRINKING WATER U.S. Environmental Protection Agency Washington, D.C. December FOREWORD Preliminary studies conducted in the early 's indicated that the storage, treatment and disposal of liquid wastes in surface impoundments could be a .

CCR surface impoundments are defined as impoundments which are designed to hold an accumulation of CCR and liquids, and the unit treats, stores, or disposes of CCR. "Stormwater run-off ponds" would not generally be expected to meet the definition of CCR surface impoundment because CCR landfills, if designed in accordance with the requirements. Upgrade your Windows experiences & get more productive with Surface. See what’s new including Surface Book 3, Surface Go 2, Surface Headphones 2 & Surface Earbuds. Shop the latest on Surface Pro X, Surface Laptop 3 & Surface Pro 7. surface impoundments, the C-Pond, a non-CCR surface impoundment, will also be closed such that all surface impoundments west of Lake Shore Drive are closed at one time.1 An annotated aerial photograph of the Station’s surface impoundments located west of Lakeshore Drive is included in Figure 1 for reference. Surface Impoundments Page No. 4 of 7 The basin to the east will serve as storm water runoff and LVWW two distinct areas will be separated by a new earthen isolation berm with a gravel access road along its Size: KB.